Full tear-off, decking inspected and repaired, then a complete system installed — usually one to two days on a typical Florida single-family home.
See detailsGuide
A typical Florida single-family shingle roof is a one to two day job once the crew is on site: tear off and dry-in on day one, finish on day two. Tile runs three to seven days and metal three to five. The work is rarely what sets the date — the permit, the weather window and what the decking turns out to be underneath are.
Step 1 of 2
Pricing your roof…
One momentThey will want to walk the roof: the drainage, the access and the deck are what price a flat system, and none of it shows up from the air.
One contract, one company responsible — JAC is a licensed general contractor as well as a roofer.
You are outside Tampa Bay and Central Florida, so this is a call rather than a price. Someone will tell you straight whether we can get to you.
If we cannot, we will say so and point you at someone who can. A roofer who drives two hours to a job is a roofer who is not there when it leaks.
A roofer from the Tampa Bay office will call you to book your free inspection. You get the same written roof report, photographed slope by slope, and a fixed price once someone has actually been on the roof.
We do not show an instant price on the Gulf Coast. The aerial pricing tool only covers Central Florida, and a number we cannot stand behind is worse than no number at all.
Nobody turns up unannounced. An estimator calls you at a time you agree to, with the price.
Shingle, single-storey, average complexity: one to two days. Tile, including re-underlayment where the tiles are lifted and relaid: three to seven. Standing seam metal: three to five. Low-slope and flat: one to three depending on the system. A complex roof — many hips, valleys, dormers and penetrations — can double any of those without the house being any bigger.
Two to six weeks is the honest range in Florida, and almost none of it is roofing. Permit review is the single biggest variable and it moves by jurisdiction — some offices turn a residential reroof around in days, others in weeks. Material lead time on a stock shingle is short; on a discontinued tile profile it is not. Then the crew has to be free and the weather has to hold.
Rain, obviously — but not the way people think. A crew will not tear off more than it can dry in before the afternoon storm, so wet-season work goes in smaller bites rather than stopping. The real delays are permit review, a decking surprise once the old covering is off, and on a pre-2002 home the re-nailing the code requires. That last one is foreseeable and should be priced before it is found.
No. It is loud, it is dusty in the attic, and there will be a dumpster and a crew on the drive from early. Pets are the real consideration — the noise is severe at ground level — and anything hanging on walls directly under the deck is worth taking down for the day. You do not need to be home, though somebody reachable by phone helps if the decking throws up a decision.
Not the shingles. Labour is the largest line on nearly every reroof, and decking replacement is the one that moves most between the estimate and the invoice — which is exactly why the per-sheet price should be on the estimate before anyone starts, not discovered afterwards.
Need this doing rather than reading about? Roof Replacement — Shingle re-roof $11k–$20k · free inspection.
One day for a straightforward single-storey shingle roof, two if the pitch is steep, the roof is complex or decking has to be replaced. Square footage matters far less than the number of planes, valleys and penetrations.
Typically a 7am start and finishing mid-afternoon in summer, because Florida heat on a roof surface after about 2pm is genuinely dangerous and the afternoon storm arrives on a schedule. Early starts are not the crew being inconsiderate — they are how the job gets done safely.
You do not need to. Being reachable by phone is worth more than being present, because the one genuine decision point is what the decking looks like once the old covering is off.
Labour, then decking. The covering itself is usually a smaller share of the total than homeowners expect, which is why upgrading from a standard to a premium shingle changes the price less than people assume.
A simple single-storey shingle roof, yes, and it happens often. What cannot be compressed is the permit beforehand and the inspection afterwards.
Full tear-off, decking inspected and repaired, then a complete system installed — usually one to two days on a typical Florida single-family home.
See details
Pipe boots, lifted ridge cap, failed valley flashing, cracked tiles. We fix what is broken, and say so plainly when a repair is only buying months.
See details
Tarp and dry-in first, then photograph the roof plane by plane and put it in writing — a report you can hand straight to your insurance carrier.
See details
A written, photographed report on every slope, flashing and penetration, with the remaining life. Free, and yours to keep whether you hire us or not.
See details
Architectural shingle installed as a complete system: underlayment, fastening pattern, metal and ventilation. Owens Corning Platinum Preferred.
See details
On tile the underlayment is the waterproofing, so most Florida tile work is re-underlayment: tiles off, a new system down, the same tiles back on.
See details
Standing seam and 5V crimp — 40 to 70 years, high wind ratings, and it sheds heat instead of holding it. Two to three times shingle up front.
See details
TPO, modified bitumen and flat systems, phased building by building so tenants keep trading and every unit is dried in before we leave each night.
See details
Gutters, soffit and fascia, re-roofing under an existing solar array, and the interior damage under a leak. We hold the general contractor's licence, so it is one contract, not two.
See detailsMon–Fri 8am–5pm · Sat 8am–12pm · storm and active-leak calls answered after hours. Call Tampa Bay on (813) 920-9644 — or send your address and we'll come and look at it.